{"id":52330,"date":"2026-02-05T08:25:36","date_gmt":"2026-02-05T08:25:36","guid":{"rendered":"https:\/\/grande-cote.eramet.com\/?p=52330"},"modified":"2026-02-17T14:09:11","modified_gmt":"2026-02-17T14:09:11","slug":"eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level","status":"publish","type":"post","link":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/","title":{"rendered":"Eramet Grande C\u00f4te achieves IRMA 50 performance level"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-justify-content-center fusion-flex-content-wrap\" style=\"max-width:1468.8px;margin-left: calc(-2% \/ 2 );margin-right: calc(-2% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.47%;--awb-margin-bottom-large:30px;--awb-spacing-left-large:1.47%;--awb-width-medium:66.666666666667%;--awb-spacing-right-medium:1.47%;--awb-spacing-left-medium:1.47%;--awb-width-small:100%;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><ul>\n<li>Eramet Grande C\u00f4te, Eramet Group\u2019s first site audited according to the IRMA standard, a global benchmark for responsible mining.<\/li>\n<li>First site audited according to the IRMA standard in Senegal, and the first mineral sands site to achieve this level globally.<\/li>\n<li>Eramet Grande C\u00f4te is now among the 14 mining sites worldwide with an IRMA performance evaluation<\/li>\n<li>A voluntary approach to enter the IRMA audit process, announced by Eramet as early as 2022.<\/li>\n<li>An independent external audit conducted according to the IRMA standard, assessing the robustness of the site&#8217;s environmental, social, and governance practices<\/li>\n<li>An audit report made public on the IRMA website, as part of a follow-up audit cycle every 18 months to assess ongoing compliance with the standard&#8217;s requirements.<\/li>\n<\/ul>\n<p>Eramet announces that its Eramet Grande C\u00f4te (EGC) site, specializing in mineral sands mining in Senegal, has achieved the IRMA 50 performance level, becoming the first site within the Group to be audited under the IRMA standard. This evaluation is part of the Eramet Group\u2019s voluntary approach, initiated in 2022 through its CSR roadmap <em>Act for Positive Mining<\/em>, and is based on an independent external audit confirming the robustness of the site\u2019s environmental, social, and governance practices.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_2 1_2 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:50%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.96%;--awb-margin-bottom-large:30px;--awb-spacing-left-large:1.96%;--awb-width-medium:50%;--awb-spacing-right-medium:1.96%;--awb-spacing-left-medium:1.96%;--awb-width-small:100%;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-image-element \" style=\"--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);\"><span class=\" fusion-imageframe imageframe-none imageframe-1 hover-type-none\"><img decoding=\"async\" width=\"1920\" height=\"1080\" title=\"IRMA-50\" src=\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50.jpg\" data-orig-src=\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50.jpg\" alt class=\"lazyload img-responsive wp-image-52346\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271920%27%20height%3D%271080%27%20viewBox%3D%270%200%201920%201080%27%3E%3Crect%20width%3D%271920%27%20height%3D%271080%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50-200x113.jpg 200w, https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50-400x225.jpg 400w, https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50-600x338.jpg 600w, https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50-800x450.jpg 800w, https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50-1200x675.jpg 1200w, https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-50.jpg 1920w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 640px) 100vw, 800px\" \/><\/span><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.47%;--awb-margin-bottom-large:30px;--awb-spacing-left-large:1.47%;--awb-width-medium:66.666666666667%;--awb-spacing-right-medium:1.47%;--awb-spacing-left-medium:1.47%;--awb-width-small:100%;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-2\"><h2>IRMA, a reference standard for responsible mining<\/h2>\n<p>The IRMA Standard for Responsible Mining was developed through a broad public consultation process involving more than <strong>100 organizations and stakeholders<\/strong>: NGOs, unions, communities, mining companies, clients, and end-users of mining products.<\/p>\n<p>Recognized as one of the \u00a0<strong>most comprehensive and demanding evaluation frameworks in the sector, <\/strong>an IRMA Achievement distinguishes four performance levels: <strong>IRMA Transparency<\/strong>, corresponding to third-party evaluation and the publication of results; <strong>IRMA 50, 75, and 100<\/strong>, reflecting the progressive compliance with a set of critical requirements and a score of at least 50%, 75%, or 100% in each of the four principle area of the Standard: \u00a0social responsibility, environmental responsibility, business integrity, and planning for positive legacies.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-3 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-padding-top:30px;--awb-padding-right:30px;--awb-padding-bottom:30px;--awb-padding-left:30px;--awb-overflow:hidden;--awb-bg-color:var(--awb-custom_color_6);--awb-bg-color-hover:var(--awb-custom_color_6);--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-border-radius:10px 10px 10px 10px;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.47%;--awb-margin-bottom-large:30px;--awb-spacing-left-large:1.47%;--awb-width-medium:66.666666666667%;--awb-spacing-right-medium:1.47%;--awb-spacing-left-medium:1.47%;--awb-width-small:100%;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-3\"><h2>Robust results across all pillars of the IRMA standard<\/h2>\n<p>The audit of Eramet Grande C\u00f4te highlights a solid foundation of environmental, social, and governance practices, with the following performance levels:<\/p>\n<ul>\n<li><strong>Business integrity (governance, transparency and ethical practices):\u00a0<\/strong>74%<\/li>\n<li><strong>Planning for positive legacies:\u00a0<\/strong>67%<\/li>\n<li><strong>Social responsibility:\u00a0<\/strong>74\u00a0%<\/li>\n<li><strong>Environmental responsibility:\u00a0<\/strong>67%<\/li>\n<\/ul>\n<p>These results highlight robust practices, while also identifying areas for improvement addressed through dedicated action plans.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-4 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.47%;--awb-margin-bottom-large:30px;--awb-spacing-left-large:1.47%;--awb-width-medium:66.666666666667%;--awb-spacing-right-medium:1.47%;--awb-spacing-left-medium:1.47%;--awb-width-small:100%;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-4\"><h2>An audit approach based on transparency<\/h2>\n<p>The IRMA approach undertaken by Eramet is <strong>voluntary <\/strong>and based on an independent external evaluation, accompanied by the full publication of the audit report. This choice reflects a commitment to transparency regarding the site\u2019s practices and to the structuring of a continuous improvement process.<\/p>\n<p>In accordance with the IRMA standard requirements, the audit will be supplemented by follow-up audits conducted every 18 months to verify the continued maintenance of the level achieved. The results will continue to be made publicly available on the IRMA website and the Eramet Grande C\u00f4te website for all stakeholders.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-5 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-padding-top:30px;--awb-padding-right:30px;--awb-padding-bottom:30px;--awb-padding-left:30px;--awb-overflow:hidden;--awb-bg-color:var(--awb-custom_color_6);--awb-bg-color-hover:var(--awb-custom_color_6);--awb-bg-size:cover;--awb-border-radius:10px 10px 10px 10px;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:0.98%;--awb-margin-bottom-large:50px;--awb-spacing-left-large:0.98%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:0.98%;--awb-spacing-left-medium:0.98%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-5 fusion-text-no-margin\"><p><img decoding=\"async\" class=\"lazyload quart alignleft wp-image-33951 size-thumbnail\" style=\"border-radius: 50%; margin-top: 40px;\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27150%27%20height%3D%27150%27%20viewBox%3D%270%200%20150%20150%27%3E%3Crect%20width%3D%27150%27%20height%3D%27150%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"\/wp-content\/uploads\/sites\/26\/2026\/02\/2025-EGC-Frederic-Zanklan-600x600.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/p>\n<blockquote>\n<p>Eramet Grande C\u00f4te is the first mine to obtain IRMA in West Africa. This IRMA 50 result clearly marks an important milestone for EGC, its teams, and local communities. It is fully aligned with the directions promoted by the State of Senegal, which seeks to position the mining sector as a lever for economic sovereignty, local value creation, and responsible development, based on high standards of transparency and good governance. Through this demanding audit, we reaffirm our commitment to continuously strengthen our practices and anchor our operations in a dynamic of long-term value creation, in close collaboration with local stakeholders and in full alignment with Eramet\u2019s Act for Positive Mining vision.<\/p>\n<\/blockquote>\n<p><strong>Fr\u00e9d\u00e9ric Zanklan<\/strong><br \/>\nManaging Director of Eramet Grande C\u00f4te<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-6 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-padding-top:30px;--awb-padding-right:30px;--awb-padding-bottom:30px;--awb-padding-left:30px;--awb-overflow:hidden;--awb-bg-color:var(--awb-custom_color_6);--awb-bg-color-hover:var(--awb-custom_color_6);--awb-bg-size:cover;--awb-border-radius:10px 10px 10px 10px;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:0.98%;--awb-margin-bottom-large:50px;--awb-spacing-left-large:0.98%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:0.98%;--awb-spacing-left-medium:0.98%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-6 fusion-text-no-margin\"><p><img decoding=\"async\" class=\"lazyload quart alignleft wp-image-33951 size-thumbnail\" style=\"border-radius: 50%; margin-top: 40px;\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27150%27%20height%3D%27150%27%20viewBox%3D%270%200%20150%20150%27%3E%3Crect%20width%3D%27150%27%20height%3D%27150%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"\/wp-content\/uploads\/sites\/26\/2026\/02\/Eramet-Virginie-de-Chassey.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/p>\n<blockquote>\n<p>Achieving the IRMA 50 level validates the progress made by the Eramet Grande C\u00f4te site and the commitment of the Act for Positive Mining roadmap across all our mining sites. IRMA provides the most comprehensive, transparent, and rigorous standard in our sector, and this evaluation confirms that our integrated responsible mining practices deliver measurable and concrete results on the ground. We also intend to leverage this approach to sustainably engage our stakeholders in the adoption of increasingly demanding environmental and social practices. This milestone reflects not only the work of the Eramet Grande C\u00f4te teams, but also our determination to build trust by operating to the highest standards.<\/p>\n<\/blockquote>\n<p><strong>Virginie de Chassey<\/strong><br \/>\nChief Sustainability and External Affairs Officer of the Eramet Group<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-7 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-padding-top:30px;--awb-padding-right:30px;--awb-padding-bottom:30px;--awb-padding-left:30px;--awb-overflow:hidden;--awb-bg-color:var(--awb-custom_color_6);--awb-bg-color-hover:var(--awb-custom_color_6);--awb-bg-size:cover;--awb-border-radius:10px 10px 10px 10px;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:0.98%;--awb-margin-bottom-large:50px;--awb-spacing-left-large:0.98%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:0.98%;--awb-spacing-left-medium:0.98%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-7 fusion-text-no-margin\"><p><img decoding=\"async\" class=\"lazyload quart alignleft wp-image-33951 size-thumbnail\" style=\"border-radius: 50%; margin-top: 40px;\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27150%27%20height%3D%27150%27%20viewBox%3D%270%200%20150%20150%27%3E%3Crect%20width%3D%27150%27%20height%3D%27150%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"\/wp-content\/uploads\/sites\/26\/2026\/02\/IRMA-Aimeee-Boulanger.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/p>\n<blockquote>\n<p>This report demonstrates that mines can point to transparent, independent evaluations of their environmental and social performance. Through detailed IRMA audit reports, mining companies, communities and companies that purchase mined materials can gain the information they need, to decide what\u2019s going well \u2014 and what may require more attention \u2014 at specific mines.<\/p>\n<\/blockquote>\n<p><strong>Aimee Boulanger<br \/>\n<\/strong>Executive Director of IRMA<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-8 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.47%;--awb-margin-bottom-large:30px;--awb-spacing-left-large:1.47%;--awb-width-medium:66.666666666667%;--awb-spacing-right-medium:1.47%;--awb-spacing-left-medium:1.47%;--awb-width-small:100%;--awb-spacing-right-small:0.98%;--awb-spacing-left-small:0.98%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-8\"><h2>Identified areas for improvement to sustainably enhance performance<\/h2>\n<p>Through the IRMA audit, Eramet Grande C\u00f4te has identified several <strong>improvement levers<\/strong> aimed at further enhancing its performance and impact on local territories. These insights are part of a <strong>continuous improvement approach, supported by the definition of dedicated action plans.<\/strong><\/p>\n<p>The priorities notably focus on consolidating best practices and optimizing stakeholder engagement, strengthening the effectiveness of the grievance management mechanism, improving the monitoring of resettlement processes, and improve water quality and quantity monitoring of water, including the analysis of potential exceedances and the implementation of appropriate actions.<\/p>\n<p>The full IRMA audit report is available on IRMA\u2019s website and can be accessed via the following link:<\/p>\n<\/div><div style=\"text-align:left;\"><a class=\"fusion-button button-flat fusion-button-default-size button-custom fusion-button-default button-1 fusion-button-default-span fusion-button-default-type CTA-arrow fusion-has-button-gradient\" style=\"--button_accent_color:var(--awb-color7);--button_accent_hover_color:var(--awb-color3);--button_border_hover_color:var(--awb-color7);--button_border_width-top:0;--button_border_width-right:0;--button_border_width-bottom:0;--button_border_width-left:0;--button-border-radius-top-left:0;--button-border-radius-top-right:0;--button-border-radius-bottom-right:0;--button-border-radius-bottom-left:0;--button_gradient_angle:180deg;--button_gradient_top_color:var(--awb-custom_color_7);--button_gradient_bottom_color:var(--awb-custom_color_7);--button_gradient_top_color_hover:rgba(226,226,226,0);--button_gradient_bottom_color_hover:var(--awb-custom_color_3);--button_font_size:16px;--button_padding-right:70px;--button_padding-left:0px;\" target=\"_blank\" rel=\"noopener noreferrer\" href=\"https:\/\/responsiblemining.net\/egc\"><span class=\"fusion-button-text\">Full IRMA audit report about Eramet Grande C\u00f4te<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":55,"featured_media":52326,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[105],"class_list":["post-52330","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-release","tag-irma-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Eramet Grande C\u00f4te achieves IRMA 50 performance level - Eramet Grande C\u00f4te<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eramet Grande C\u00f4te achieves IRMA 50 performance level - Eramet Grande C\u00f4te\" \/>\n<meta property=\"og:url\" content=\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/\" \/>\n<meta property=\"og:site_name\" content=\"Eramet Grande C\u00f4te\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-05T08:25:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-17T14:09:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1436\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"idiane\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"idiane\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/\"},\"author\":{\"name\":\"idiane\",\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/#\/schema\/person\/45c5aff9786db83b8a40642e99a8363f\"},\"headline\":\"Eramet Grande C\u00f4te achieves IRMA 50 performance level\",\"datePublished\":\"2026-02-05T08:25:36+00:00\",\"dateModified\":\"2026-02-17T14:09:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/\"},\"wordCount\":2788,\"image\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg\",\"keywords\":[\"IRMA\"],\"articleSection\":[\"Press release\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/\",\"url\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/\",\"name\":\"Eramet Grande C\u00f4te achieves IRMA 50 performance level - Eramet Grande C\u00f4te\",\"isPartOf\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg\",\"datePublished\":\"2026-02-05T08:25:36+00:00\",\"dateModified\":\"2026-02-17T14:09:11+00:00\",\"author\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/#\/schema\/person\/45c5aff9786db83b8a40642e99a8363f\"},\"breadcrumb\":{\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage\",\"url\":\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg\",\"contentUrl\":\"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg\",\"width\":2560,\"height\":1436},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/grande-cote.eramet.com\/en\/eramet\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eramet Grande C\u00f4te achieves IRMA 50 performance level\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/#website\",\"url\":\"https:\/\/grande-cote.eramet.com\/en\/\",\"name\":\"Eramet Grande C\u00f4te\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/grande-cote.eramet.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/grande-cote.eramet.com\/en\/#\/schema\/person\/45c5aff9786db83b8a40642e99a8363f\",\"name\":\"idiane\",\"url\":\"https:\/\/grande-cote.eramet.com\/en\/author\/idiane\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Eramet Grande C\u00f4te achieves IRMA 50 performance level - Eramet Grande C\u00f4te","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/","og_locale":"en_US","og_type":"article","og_title":"Eramet Grande C\u00f4te achieves IRMA 50 performance level - Eramet Grande C\u00f4te","og_url":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/","og_site_name":"Eramet Grande C\u00f4te","article_published_time":"2026-02-05T08:25:36+00:00","article_modified_time":"2026-02-17T14:09:11+00:00","og_image":[{"width":2560,"height":1436,"url":"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg","type":"image\/jpeg"}],"author":"idiane","twitter_card":"summary_large_image","twitter_misc":{"Written by":"idiane","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#article","isPartOf":{"@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/"},"author":{"name":"idiane","@id":"https:\/\/grande-cote.eramet.com\/en\/#\/schema\/person\/45c5aff9786db83b8a40642e99a8363f"},"headline":"Eramet Grande C\u00f4te achieves IRMA 50 performance level","datePublished":"2026-02-05T08:25:36+00:00","dateModified":"2026-02-17T14:09:11+00:00","mainEntityOfPage":{"@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/"},"wordCount":2788,"image":{"@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage"},"thumbnailUrl":"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg","keywords":["IRMA"],"articleSection":["Press release"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/","url":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/","name":"Eramet Grande C\u00f4te achieves IRMA 50 performance level - Eramet Grande C\u00f4te","isPartOf":{"@id":"https:\/\/grande-cote.eramet.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage"},"image":{"@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage"},"thumbnailUrl":"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg","datePublished":"2026-02-05T08:25:36+00:00","dateModified":"2026-02-17T14:09:11+00:00","author":{"@id":"https:\/\/grande-cote.eramet.com\/en\/#\/schema\/person\/45c5aff9786db83b8a40642e99a8363f"},"breadcrumb":{"@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#primaryimage","url":"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg","contentUrl":"https:\/\/grande-cote.eramet.com\/wp-content\/uploads\/sites\/26\/2026\/02\/Image-de-couverture-CP-V2-scaled.jpg","width":2560,"height":1436},{"@type":"BreadcrumbList","@id":"https:\/\/grande-cote.eramet.com\/en\/eramet-grande-cote-demonstrates-the-eramet-groups-commitment-to-responsible-mining-by-achieving-irma-50-performance-level\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/grande-cote.eramet.com\/en\/eramet\/"},{"@type":"ListItem","position":2,"name":"Eramet Grande C\u00f4te achieves IRMA 50 performance level"}]},{"@type":"WebSite","@id":"https:\/\/grande-cote.eramet.com\/en\/#website","url":"https:\/\/grande-cote.eramet.com\/en\/","name":"Eramet Grande C\u00f4te","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/grande-cote.eramet.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/grande-cote.eramet.com\/en\/#\/schema\/person\/45c5aff9786db83b8a40642e99a8363f","name":"idiane","url":"https:\/\/grande-cote.eramet.com\/en\/author\/idiane\/"}]}},"acf":{"external_url":false,"pdf":52320,"external_doc_url":"","external_doc_type_and_size":"","titre_du_pdf":"","pdf_rendering":true},"_links":{"self":[{"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/posts\/52330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/users\/55"}],"replies":[{"embeddable":true,"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/comments?post=52330"}],"version-history":[{"count":5,"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/posts\/52330\/revisions"}],"predecessor-version":[{"id":52357,"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/posts\/52330\/revisions\/52357"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/media\/52326"}],"wp:attachment":[{"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/media?parent=52330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/categories?post=52330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grande-cote.eramet.com\/en\/wp-json\/wp\/v2\/tags?post=52330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}