
An optimized mining transport system by rail
From the project’s inception, the decision was made to use the railway to transport mining products between the Diogo plant and the Dakar port. As the concessionaire of part of the railway line between Mékhé and Dakar, Eramet Grande Côte constructed an additional 22-kilometer section to connect the plant to the Mékhé station.
Upon arrival in Dakar, the products are stored in Eramet Grande Côte’s port facilities before being shipped by boat to our clients around the world.

![Train-4[1]](https://grande-cote.eramet.com/wp-content/uploads/sites/26/2025/08/Train-41.jpg)